Three new MRT stations open in eastern Singapore on Saturday 26 December 2026: Bedok South (TE30), Sungei Bedok (TE31/DT37) and Xilin (DT36). They complete Stage 5 of the Thomson-East Coast Line and extend the Downtown Line beyond Expo, so the brown and blue lines meet for a second time at Sungei Bedok.

Which new MRT stations are opening?
The three new MRT stations sit between Bayshore on the Thomson-East Coast Line and Expo on the Downtown Line. All three are underground.
Bedok South
At the junction of Upper East Coast Road and Bedok South Road, beside Temasek Secondary School and close to Siglap Community Club.
Line: Thomson-East Coast Line. The station has five entrances.
Sungei Bedok
Just east of where Upper East Coast Road becomes Bedok Road, next to Bedok Food Centre and near Eastwood Centre.
Lines: interchange and eastern end of both the Thomson-East Coast Line and the Downtown Line.
Xilin
Where Xilin Avenue, Changi South Avenue 3 and Laguna Golf Green meet, serving the Changi South industrial estates and Changi Business Park.
Line: Downtown Line.
Getting around Singapore? Find any station on the interactive MRT map, or save the PDF map to use offline.
What changes on each line
| Line | New section | Length | Line after opening |
|---|---|---|---|
| Thomson-East Coast Line (Stage 5) | Bayshore to Sungei Bedok, adding Bedok South and Sungei Bedok | About 2.1 km | 29 operational stations |
| Downtown Line (Stage 3 extension) | Expo to Sungei Bedok, adding Xilin and Sungei Bedok | About 2.2 km | 37 operational stations |
Stage 5 is the last of the five stages of the Thomson-East Coast Line, which opened its first stations in 2020. Sungei Bedok becomes the second place to change between the two lines, after Stevens. The LTA says more than 240,000 households will be within a 10 minute walk of a Thomson-East Coast Line station, and over 220,000 within a 10 minute walk of a Downtown Line station.
How much time will the new MRT stations save?
The saving comes from the new link at Sungei Bedok, which lets riders in the east switch lines without travelling into the city first. The LTA gives two examples.
| Journey | Today | From 26 December 2026 |
|---|---|---|
| Havelock to Changi Business Park | About 70 minutes | About 45 minutes, a saving of up to 25 minutes |
| Marine Parade to Tampines | Not stated | Up to 10 minutes faster |
For trips between stations that are already open, use the MRT travel time calculator.
What has not been announced yet
The LTA release of 4 November 2026 gives the date but not the time of the first train. It also does not list first and last train times for the three stations, bus service changes or an open house before opening day. We will add these when the LTA or the operators publish them. Normal hours on the rest of the network are in our MRT operating hours guide.
How the new MRT stations got here
- 17 January 2013: the Land Transport Master Plan 2013 proposes extending the Downtown Line east from Expo.
- 15 August 2014: the LTA names Bedok South, Sungei Bedok and Xilin.
- 2016: construction begins at Bedok South.
- 2024, then 2025: the original 2024 target slips during the COVID-19 pandemic.
- 6 December 2024: the LTA says both extensions will open in the second half of 2026, citing difficult tunnelling close to existing infrastructure.
- 4 November 2026: Transport Minister Jeffrey Siow announces the opening date at Singapore Urban Mobility Week.
- 26 December 2026: passenger service begins.
What comes after these new MRT stations
The Thomson-East Coast Line is planned to continue from Sungei Bedok to Changi Airport Terminal 5. At the other end of the blue line, the Downtown Line 2 extension to the North South Line is expected in 2035. Our future MRT map shows every planned line, and the interactive Singapore MRT map shows what is open today.
Questions about the new MRT stations
When does Sungei Bedok MRT station open?
Sungei Bedok MRT station opens for passenger service on 26 December 2026, on both the Thomson-East Coast Line (TE31) and the Downtown Line (DT37).
When does Bedok South MRT station open?
Bedok South MRT station (TE30) opens on 26 December 2026 as part of Thomson-East Coast Line Stage 5.
When does Xilin MRT station open?
Xilin MRT station (DT36) opens on 26 December 2026 with the Downtown Line extension from Expo to Sungei Bedok.
Are Bedok South, Sungei Bedok and Xilin open now?
No. Trains will not carry passengers to the three stations until 26 December 2026. Before then, the nearest open stations are Bayshore on the Thomson-East Coast Line and Expo on the Downtown Line.
How many stations will the Thomson-East Coast Line and Downtown Line have?
After the opening, the LTA counts 29 operational stations on the Thomson-East Coast Line and 37 on the Downtown Line.
Source: Land Transport Authority news release, Thomson-East Coast Line Stage 5 and Downtown Line 3 Extension to open for passenger service from 26 December 2026, 4 November 2026. Last checked 24 November 2026.
