The Singapore MRT map 2024 is now out of date. Since the start of 2024 the network has gained 12 stations, and three more open on 26 December 2026. This page shows what the 2024 and 2025 maps looked like, what has been added since, and where to get the current map.

Singapore MRT map 2024, 2025 and 2026 compared
2024 map
At the start of 2024 the Thomson-East Coast Line ended at Gardens by the Bay. Two openings changed the map during the year.
- 23 June 2024: seven stations from Tanjong Rhu to Bayshore
- 10 December 2024: Punggol Coast on the North East Line
2025 map
The MRT map 2025 has one addition over the end of 2024.
- 28 February 2025: Hume (DT4) on the Downtown Line
The Circle Line still had a gap between HarbourFront and Marina Bay.
2026 map
The current map closes the Circle Line loop and reaches further east.
- 12 July 2026: Keppel, Cantonment and Prince Edward Road
- 26 December 2026: Bedok South, Sungei Bedok and Xilin
Getting around Singapore? Find any station on the interactive MRT map, or save the PDF map to use offline.
The Singapore MRT map 2024 image

This is the map we published in September 2024. Keep it for reference only, and use the current map above for travel.
Every change since the Singapore MRT map 2024
| Date | Line | What opened |
|---|---|---|
| 23 June 2024 | Thomson-East Coast Line Stage 4 | Tanjong Rhu, Katong Park, Tanjong Katong, Marine Parade, Marine Terrace, Siglap and Bayshore |
| 10 December 2024 | North East Line extension | Punggol Coast (NE18) |
| 28 February 2025 | Downtown Line | Hume (DT4) |
| 12 July 2026 | Circle Line Stage 6 | Keppel, Cantonment and Prince Edward Road, completing the loop |
| 26 December 2026 | Thomson-East Coast Line Stage 5 and Downtown Line extension | Bedok South, Sungei Bedok and Xilin. See the three new MRT stations |
Open stations by line: 2024 map against today
| Line | Start of 2024 | Now | From 26 December 2026 |
|---|---|---|---|
| Thomson-East Coast Line | 20 | 27 | 29 |
| North East Line | 16 | 17 | 17 |
| Downtown Line | 34 | 35 | 37 |
| Circle Line | 30 | 33 | 33 |
The North South Line and East West Line have not gained stations since 2024, so those parts of an older map still match what you see on the platforms.
Older and future maps
For earlier years, see the MRT map 2017 and the MRT map 2014. The official version is explained in our guide to the LTA system map, and the lines still to come are on the future MRT map.
Singapore MRT map 2024: common questions
Is the Singapore MRT map 2024 still accurate?
No. A 2024 map is missing Hume, the three Circle Line stations opened on 12 July 2026 and, depending on the month it was printed, the stations from Tanjong Rhu to Bayshore and Punggol Coast.
What changed on the MRT map in 2024?
Thomson-East Coast Line Stage 4 opened seven stations from Tanjong Rhu to Bayshore on 23 June 2024, and the North East Line was extended to Punggol Coast on 10 December 2024.
What changed on the MRT map in 2025?
Hume station (DT4) on the Downtown Line opened on 28 February 2025.
Where can I download the latest Singapore MRT map?
Use the MRT map PDF page on this site for a printable copy, or open the interactive map on the homepage to tap any station.
Opening dates are from Land Transport Authority announcements, including the 4 November 2026 news release. Last checked 24 November 2026.
